FL Condominium safety law
Florida requires a milestone structural inspection for condominium and cooperative buildings of three or more habitable stories, by the end of the year the building turns 30 (25 where the local building official requires it), then every 10 years. When Phase 1 finds substantial deterioration, Phase 2 may call for destructive or nondestructive testing. Associations must also complete a structural integrity reserve study (SIRS).
A licensed engineer or architect performs the inspection. ABTS works alongside them and supplies the measured corrosion data behind their findings, repair scope and reserve estimates.
Milestone Phase 2 testing & SIRS support →
Requirements change. Confirm what applies to your building with your engineer and association counsel.