Florida's milestone inspection law requires a licensed engineer or architect to inspect condominium and cooperative buildings of three or more habitable stories. When Phase 1 finds substantial structural deterioration, Phase 2 may call for destructive or nondestructive testing. ABTS performs that testing for your engineer and turns it into clear data for repairs and reserves.
- Works with your engineer of record
- Corrosion, chloride and carbonation data
- Results ready for Phase 2 reports and SIRS
The law in brief
- Which buildings. Three or more habitable stories, in whole or in part under condominium or cooperative ownership (Section 553.899, Florida Statutes).
- When. By December 31 of the year the building reaches 30 years from its certificate of occupancy, then every 10 years. The local enforcement agency may require it at 25 years where local conditions, such as proximity to salt water, justify it.
- Phase 1. A visual examination by a licensed architect or engineer.
- Phase 2. Required when Phase 1 finds substantial structural deterioration. The statute says it may involve destructive or nondestructive testing at the inspector's direction.
- SIRS. Associations must also complete a structural integrity reserve study for these buildings and repeat it every 10 years.
The rules have changed several times since 2022. Confirm your deadlines with your engineer, association counsel and local building department.
Where ABTS fits
Your milestone inspection is performed and signed by your licensed engineer or architect. ABTS does not replace them. We carry out the testing Phase 2 calls for and report it in a form they can use directly: where corrosion is active, how far chlorides and carbonation have reached, and which areas look sound but are already at risk.
With measured quantities instead of visual estimates, your engineer can define the repair scope with more confidence, and contractors can bid against the same numbers.
Typical Phase 2 testing scope
- Sounding survey of balconies, slab edges and walkways, with delaminations marked on the drawings. See balcony and garage testing.
- Half-cell potential mapping of representative areas
- Chloride profiles and carbonation depth at selected locations
- Electrical continuity checks and exploratory openings to see bar condition
- Pool shell and pool deck testing where the pool sits over occupied space. See pool shell assessment.
Testing data for your SIRS
A SIRS estimates the remaining useful life and replacement cost of items such as the load-bearing structure, roof, floors and waterproofing, and sets the reserve funding for them. Corrosion data narrows those estimates: a balcony stack with low chlorides and passive readings needs a very different budget from one where corrosion is already active.
FAQ
Frequently asked questions
Can ABTS perform our milestone inspection?
The inspection must be performed by an architect or engineer licensed in Florida. ABTS provides the corrosion testing and data behind it, working with the engineer your association hires.
Our building is 25 years old. Do we need a milestone inspection?
The statewide trigger is 30 years, but the local enforcement agency may require the inspection at 25 years where local conditions, such as proximity to salt water, justify it. Check with your building department.
Is Phase 2 testing disruptive for residents?
Most tests are non-destructive and need only short access to balconies or common areas. Cores and test openings are small and patched when we finish.
Do Miami-Dade and Broward have their own programs?
Both counties also run their own building recertification and safety inspection programs alongside the state law. Your engineer will confirm which reports your building needs.